Independent report · SpaceTech / Launch Vehicles

Skyroot Aerospace: Orbital Progress vs Revenue Quality

June 20, 2026 · By Abhinav

Skyroot Aerospace company material

Independent report content

INDEPENDENTREPORT

Skyroot Aerospace Indian SpaceTech Small-Satellite Launch Vehicles Series C June 25, 2026 ROUND Series C, May 7, 2026 AMOUNT $60M equity + $10.8M BlackRock NCD (non-dilutive)

VA LUAT ION $1.1B pre-money (India's first spacetech unicorn) LEADS GIC (Singapore SWF) Sherpalo Ventures (Ram Shriram, Alphabet board member, new board seat) C O - INVES TO R S BlackRock funds Greenko Group founders Shanghvi Family Office Arkam Ventures Playbook Partners

FY 2 6 REVENUE

( P R OV ISIONAL )

Rs 101 Cr (Space Systems components, NOT commercial launch revenue) FY 2 6 EBIT DA Rs -130.3 Cr (Entrackr)

CINU74999TG2018PTC126727

H Q Hyderabad, Telangana

FOUNDED 2018

TOTA LRAISED $160M across 11 rounds, 35 investors

CRITICALS TAT U S

Vikram-1 at Sriharikota launch pad. Launch campaign active as of June 2026. Orbital insertion NOT YET CONFIRMED as of June 25, 2026. Every forward assumption in this report is conditional on this event.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

★ INVESTMENT SUMMARY

Skyroot Aerospace Indian SpaceTech | Small Satellite Launch Vehicles | Series C | India's First Space-Tech Unicorn

RUPEIASIGNALBAR

Five dimensions, each independently assessed: Round: Series C, May 7, 2026 | Amount: $60M equity + $10.8M BlackRock NCD (non-dilutive) | Valuation: $1.1B pre-money (India's first spacetech unicorn) Leads: GIC (Singapore SWF) | Sherpalo Ventures (Ram Shriram, Alphabet board member, new board seat)

Co-investors: BlackRock funds | Greenko Group founders | Shanghvi Family Office | Arkam Ventures | Playbook Partners FY26 Revenue (provisional): Rs 101 Cr (Space Systems components, NOT commercial launch revenue) | FY26 EBITDA: Rs -130.3 Cr (Entrackr)

CIN : U 7 4 9 9 9 T G 2 0 1 8 PTC 1 2 6 7 2 7

| HQ: Hyderabad, Telangana | Founded: 2018 | Total Raised: $160M across 11 rounds, 35 investors CRITICAL STATUS: Vikram-1 at Sriharikota launch pad. Launch campaign active as of June 2026. Orbital insertion NOT YET CONFIRMED as of June 25, 2026. Every forward assumption in this report is conditional on this event.

EXECUTIVESUMMA RY India's only private company with an orbital-class rocket at the launch pad.

Vikram-1 (350 kg LEO, 4-stage carbon composite, 3D-printed engines) is in launch campaign at Sriharikota. Behind it: 8 years of engineering, 5 engine/stage programs all qualified on first attempt, the 2022 Vikram-S suborbital success, and $160M from some of the most credible spacetech investors in Asia. The

investment is a single binary bet: does Vikram-1 achieve orbital insertion? If yes,

India's commercial launch market opens, Exolaunch's 250+ international customers become accessible, and the $1.1B valuation is the entry price to a Rs 30,000+ Cr outcome. If no, the company faces an 18-24 month recovery, a down- round, and a reset of all forward projections.

COM PA N Y Entity: Skyroot Aerospace Private Limited | CIN: U74999TG2018PTC126727HQ: Hyderabad, Telangana, IndiaFounded: 2018 by two ex-ISRO scientistsFacilities: Max-Q (60,000 sq ft, PM Modi inaugurated Nov 2025) | Infinity Campus | Sriharikota access (ISRO-owned)IN-SPACe: Authorised, first private

company to launch from SDSC

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

FOUNDERS Pawan Kumar Chandana, CEO: Ex-ISRO satellite systems, LVM3 programme. IIT Kanpur. Public face, fundraiser. 8-year commitment.Naga Bharath Daka, COO: Ex-ISRO launch vehicle propulsion. NIT Warangal. Engineering design authority. Equivalent role: Chief Rocket Engineer.Both left ISRO in 2018 for Skyroot.

Deepest possible domain credibility in Indian rocketry. Not hireable. Cannot be replicated by any competitor. COREVEHICLES Vikram-1 (launch imminent): 3 solid stages + liquid kick stage. 350 kg LEO / 260 kg SSO. All-carbon composite. 3D-printed Raman engines. At Sriharikota.Vikram-2 (development, 2027 target): Cryogenic upper stage (Dhawan series). 900 kg LEO. Dhawan-III qualified Feb 2026.Vikram-S (flew Nov 2022): Suborbital demonstrator. 89.5 km altitude. India's first private rocket in space.

VERIFIED.

FINANCIALS ( MCA /

P R OV ISIONAL )

NOTE ON FY23/FY24 "REVENUE": Rs 14.6 Cr (FY23) and Rs 29.0 Cr (FY24) are INTEREST INCOME on capital, not commercial revenue. Operating revenue was near-zero through FY25.FY26 (provisional, Entrackr): Rs 101 Cr operating revenue (Space Systems components) | EBITDA Rs -130.3 CrFY25 (MCA): Rs 0

operating revenue | EBITDA Rs -107.7 CrFY24 (MCA, confirmed): Rs 29 Cr

interest income | Net Loss Rs 55.3 Cr | Expenses Rs 84.5 Cr PIPELINE & PA RT NERS Exolaunch SPA (Oct 2025): VERIFIED, access to 250+ customers, 20 countriesAxiom Space MoU (Jun 2025): PROBABLE, LEO logistics, non- binding~100 Indian govt satellites: CLAIMED, CEO stated, no contract listVikram-S paying payloads: VERIFIED, SpaceKidz India, BazoomQ, N-Space Tech (Nov 2022)

USEOFPROCEEDS Vikram-1 launch cadence scale-up | Vikram-2 cryogenic development ($50-80M est.) | Manufacturing expansion (Telangana private facility MoU) | US/EU AIT facilities (2027 target) | Team expansionALLOCATION NOT DISCLOSED: Rupeia estimates: Vikram-2 35% | Cadence 25% | Facilities 20% | Team 15% | Working capital 5%

0A CLAIM REGISTER, EVIDENCE GRADING

A = Statutory/regulatory/government | B = Patent/certification/customer-side | C = Independent press/investor | D = Company press release/website | E = No evidence or conflict

CLAIM SOURCE GRADE RUPEIA ASSESSMENT

India's first private rocket in space (Vikram-S, Nov 2022) ISRO, Wikipedia, multiple international press A VERIFIED. 89.5 km altitude. First private launch from SDSC.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

CLAIM SOURCE GRADE RUPEIA ASSESSMENT

All 5 engine/stage programs qualified first attempt

Company press +

Wikipedia mission records C PROBABLE. Kalam-1200, Kalam-250, Kalam-100, Raman, Dhawan-III, all passed on first attempt. Extraordinary record. No independent witness report found but consistent across 4+ years of company communications.

Vikram-1 at Sriharikota, launch campaign active

Business Standard

Apr 25, 2026; CBInsights Apr 8, A VERIFIED. Flagged off from Hyderabad Apr 25 by Telangana CM. Fairing sep test Apr 8 passed. Orbital launch NOT YET CONFIRMED as of Jun 25, 2026.

$1.1B pre-money unicorn valuation TechCrunch, SpaceNews, Business Standard May 7, 2026 C VERIFIED AS DISCLOSED FIGURE. Three tier-1 media citing

company/investor statements. Pre-money figure. Post-money

~$1.16B. FY26 Revenue Rs 101 Cr (Space Systems) Entrackr Jun 2, 2026 (provisional statements reviewed)

B HIGH CONFIDENCE, provisional. First genuine operating revenue. Space Systems components only. NOT commercial launch revenue. FY26 EBITDA Rs -130.3 Cr; FY25 EBITDA Rs -107.7 Cr Entrackr Jun 2026 provisional B HIGH CONFIDENCE, provisional. EBITDA worsening despite revenue: FY26 loss-to-revenue ratio 129%.

"~100 India govt small satellites in pipeline" CEO via Via Satellite Mar 2026 D CLAIMED. No verified contract list. Pipeline real (IN-SPACe policy) but not assigned to Skyroot.

Exolaunch SPA, 250+ international customers accessible Exolaunch official press Oct 14, 2025 A VERIFIED. SPA signed. EXOtube integration confirmed.

Access to 20-country network. Max-Q facility inaugurated by PM Modi, Nov 2025

Business Standard,

multiple government

sources

A VERIFIED. PM Modi inauguration confirmed. 60,000 sq ft. ~300 personnel capacity. 40% cheaper than Western competitors CEO + Ram Shriram (Sherpalo), SpaceNews May 2026 C PROBABLE. India engineering salaries 60-70% below US/EU structurally validates claim. No independent launch cost audit exists.

Vikram-2: 900 kg LEO, debut 2027 SpaceNews May 2026 (citing company)

C PROBABLE with CONFLICT: earlier sources said 1,100 kg. SpaceNews citing Series C announcement used as primary. Verify with company. Rs 13,205 Cr revenue by FY32 Entrackr (internal projection documents)

D MANAGEMENT PROJECTION. 130x current revenue in 6 years = 97% CAGR. Bull case only, not base case.

MOSTCRITICALUNVERIFIEDCLAIMASOFJUN 2 5 , 2 0 2 6

Vikram-1 first orbital launch has NOT been confirmed as successful. The rocket is at the launch pad. The launch campaign is active. But "launch imminent" is not "launch completed." Every forward assumption, commercial revenue, cadence, Exolaunch activation, government pipeline conversion, is conditional on a successful orbital insertion confirmation. Do not assume this has occurred. Verify before investment commitment.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

0B FACT-CHECK & CORRECTIONS LOG

FIELD AS STATED VERIFIED POSITION SOURCE

FY23/FY24

REVENUE

NATURE

Rs 14.6 Cr (FY23) and Rs 29.0 Cr (FY24) cited as "revenue" in most coverage CORRECTION: Both are INTEREST INCOME on raised capital, not commercial, not operational. Operating revenue was Rs ~40 lakh in FY23 (less than 3% of reported figure). FY25 = Rs 0 operating revenue. First genuine operating revenue = FY26 Rs 101 Cr (Space Systems).

Entrackr Jun 2026; YourStory Oct

ROUND

DESIGNATION

Called "Series B" by some sources; "Series C" by others SETTLED: Rupeia uses Series C for May 2026 round ($60M). The Oct 2023 Temasek-led round ($27.5M) was a "pre-Series C" or "Series B-II." TechCrunch and StartupTalky confirm Series C designation for May 2026.

TechCrunch May 2026; StartupTalky

TEMASEK

NON-

FOLLOW-ON

Temasek led Oct 2023 round. Some sources imply Temasek in Series C. FLAG: Temasek does NOT appear in Series C May 2026 investor list. A prior lead not following on. Less alarming than Steadview/Ethereal case because: (1) GIC (fellow Singapore SWF) co-leads = Singapore capital is continuous; (2) Temasek and GIC coordinate on Indian investments; (3) Fund concentration limits plausible. But must be asked directly.

TechCrunch May 2026 Series C list

VIKRAM-2

PAYLOAD

Wikipedia: 1,100 kg LEO. SpaceNews: 900 kg LEO. CONFLICT: SpaceNews citing company statement in Series C announcement (May 7, 2026) used as primary. Wikipedia figure may be older spec or different configuration. Rupeia flags until company confirms.

SpaceNews May 2026 (primary)

VIKRAM-S

MISSION

"Failed" or "partial" characterised in some social media VERIFIED CORRECT: Mission designed as suborbital demonstrator. Reached 89.5 km (above Karman line per some definitions; below 100 km per strict definition). All mission objectives achieved. First private rocket from Sriharikota. Declared success by ISRO and

company. Not an orbital attempt.

ISRO records; Wikipedia

EMPLOYEE

COUNT

Range of figures: 500+ (Grokipedia Jan 2026), 650+ (Exolaunch Oct 2025), 879 (Inc42 Jun 2026), 1,000+ (Dailyhunt May 2026)

PRIMARY: Inc42 Datalabs Jun 2026 (MCA- adjacent): 879. Used as primary. Rapid scaling period. Exolaunch figure is 8 months old. Dailyhunt may count contractors. Verify via EPFO employer portal.

Inc42 Datalabs Jun 2026

BLACKROCK

NCD $10.8M (SpaceNews/TechCrunch); "Rs 100 Cr" (Entrackr) MINOR CONFLICT: At Rs 83.5/$1, $10.8M = Rs 90.2 Cr. Entrackr Rs 100 Cr implies different rate/rounding. $10.8M used (SpaceNews primary; amount also confirmed by CBInsights at $10.75M).

SpaceNews; CBInsights Data-Room Gap Statement Rupeia did not access the company data room. The following private items were approximated through public-source triangulation. Verify all before capital commitment.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

PRIVATE DATA NEEDED PUBLIC PROXY USED CONFIDENCE INVESTMENT IMPACT

Confirmed signed launch customer contracts Exolaunch SPA + CEO interviews + IN-SPACe pipeline stated LOW, MoUs not binding Revenue visibility post- launch entirely depends on this Post-failure recovery plan + insurance details Industry precedent (Rocket Lab first failure response; SpaceX Falcon 1 x3 failures)

LOW A failed launch without insurance = severe capital

risk

Vikram-2 full capex budget breakdown Announced as use-of-proceeds; $50- 80M industry comp (Rocket Lab RLSO)

MEDIUM Series D timing and dilution depend on this figure ITAR compliance status and legal opinion Not verifiable from public sources NONE Critical for US customer eligibility Committed launch slots from IN-SPACe/ISRO beyond first mission No public letter found NONE Revenue scaling impossible without confirmed pad access Actual Vikram-1 launch date and outcome rocketlaunch.org: "NET 2026 TBD" NONE, PENDING The only thing that matters right now

1 COMPANY OVERVIEW

Skyroot Aerospace is India's only private company to have reached space with a self-built rocket and the only one with an orbital-class launch vehicle at the launchpad as of June 2026. Founded in 2018 by Pawan Kumar Chandana and Naga Bharath Daka, two former ISRO scientists who left one of the world's most prestigious national space agencies to build something it could not: a commercially competitive, on-demand private rocket at Indian cost for the global small satellite market.

The origin story is a genuine differentiator, not a marketing narrative. Chandana worked on ISRO's LVM3 (the most powerful Indian rocket); Daka worked on launch vehicle propulsion. They carry institutional ISRO knowledge that cannot be hired. In 2022, Vikram-S became India's first private rocket in space, a suborbital flight that also served as a qualification campaign for Vikram-1. Chandana has stated that "almost 80% of the same technology" from Vikram-S was carried into Vikram-1. Four years later, every Vikram-1 stage has been independently static-fired, all on the first attempt. The launch hardware is at Sriharikota.

What makes Skyroot structurally different from every other Indian spacetech startup is simple: they are 4-6 years ahead of any new entrant, and they are the only Indian company to have put hardware at an orbital launch pad. AgniKul Cosmos is building Agnibaan but achieved only suborbital with their 3D-printed Agnilet engine in May 2024. Every other Indian rocket is still in development. Skyroot's moat is not its technology specification, it is time.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

2 CORE TECHNOLOGY, VIKRAM VEHICLE FAMILY

A. Vikram-1 (Orbital, Launch Campaign Active)

PARAMETER SPECIFICATION

EVIDENCE

GRADE NOTES

Configuration 3 solid stages (Kalam series) + liquid kick stage (Raman engine cluster) A Architecture confirmed across all

sources; independently consistent

Payload, LEO 350 kg (45 deg incl., 500 km alt.) | Conflict: Vikram wiki says 480 kg C SpaceNews and TechCrunch use 350 kg; older wiki shows 480 kg. Use 350 kg until company confirms.

Payload, SSO 260 kg to Sun-Synchronous Orbit (500 km) C SpaceNews May 2026; consistent with

company positioning

Stage 1: Kalam- 120-ton peak thrust; 1.7m diam; 10m long; carbon composite; robotic winding in-house B Static fire Aug 8, 2025 at SDSC confirmed (Wikipedia; company press).

First attempt. Stage 2: Kalam- 85-sec burn duration; static-fired Mar 27, 2024 at Sriharikota A ISRO facility test confirmed. First attempt.

Stage 3: Kalam- 100 kN peak vacuum thrust; 102-sec static fire Apr 2025; flex-nozzle TVC A Confirmed Apr 2025. First attempt.

Kick stage: Raman engines Hypergolic MMH/NTO; 4x engines; 3.4 kN total; flight-qualified Jun 2023 B Company press + Wikipedia. First qualification attempt.

Structure All-carbon composite, lighter, faster to

manufacture, lower recurring cost B 3D-printed engines claimed: weight -50%, production time -80% vs conventional machining Fairing separation test Apr 8, 2026, all clear B CBInsights Apr 8, 2026; company press release Current status Flight hardware at Sriharikota since Apr 25, 2026. Integration active.

A Business Standard Apr 25, 2026. Telangana CM flag-off event. Physical arrival confirmed. B. Vikram-2 (In Development, 2027 Debut Target)

PARAMETER SPECIFICATION STATUS / NOTES

Key upgrade Cryogenic upper stage (Dhawan series) replaces Raman kick stage, major performance leap In development; Dhawan-III engine qualified Feb 2026 (145-sec endurance test)

Payload, LEO 900 kg (SpaceNews May 2026 citing company) | Conflict: earlier specs 1,100 kg CONFLICT, verify with company directly Payload, SSO 600 kg (SpaceNews May 2026) PROBABLE (same source as LEO figure)

Dhawan engines

(LOX/LNG)

3D-printed; fully regeneratively cooled. Dhawan-II: 200- sec test Apr 2023. Dhawan-III: 145-sec Feb 2026. ENGINE QUALIFIED, not full stage integration yet

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

PARAMETER SPECIFICATION STATUS / NOTES

Full stage development budget Estimated $50-80M (Rocket Lab RLSO comparable) NOT PUBLICLY DISCLOSED, critical unknown Target debut 2027 per CEO (Via Satellite Mar 2026) CLAIMED, conditional on Vikram-1 success and Series C allocation Strategic significance Expands payload class to constellation operators.

Rideshare becomes competitive. This is the revenue-scale vehicle. Vikram-1 proves technology; Vikram- 2 proves business model

3 FUNDING HISTORY & INVESTOR BEHAVIOUR FORENSICS

ROUND DATE AMOUNT

VALUATION

(EST.) LEAD INVESTORS RUPEIA NOTES

Angel / Pre- Seed Jul 2018 ~$0.76M Undisclosed AIC T-Hub Hyderabad | Mukesh Bansal Incubated T-Hub. Team of 10 at founding.

First institutional cheque within 6 months. Series A May ~$11M Undisclosed Brahmastra / Pi Ventures (co-lead) Celesta Capital, Rocketship.vc, Artha, Mayfield India, Speciale Invest. All deeptech-capable funds.

Bridge Jan 2022 ~$4.5M Undisclosed Existing investors Pre-Vikram-S bridge. This capital enabled the Nov 2022 launch. Critical round. Series B Sep ~$50.5M ~$165M (Fintrackr RoC)

GIC (Singapore SWF, board seat) LNM India Internet Ventures. GIC enters with board seat, signals multi-round intent. Series B-II / pre-Series C Oct ~$27.5M ~$519M Temasek Holdings (lead) GIC follow-on. 3.1x valuation jump from Series B in 13 months.

NCD (Debt, non-dilutive) Mar 25, $10.8M BlackRock Working capital. Pre-Series C. NCD registered against assets. Not dilutive.

Series C (Unicorn) May 7, $60M equity $1.1B pre-money GIC (co-lead) | Sherpalo Ventures / Ram Shriram (new, board seat)

BlackRock (equity tranche), Greenko founders, Shanghvi FO, Arkam, Playbook Partners. TOTAL $160M $1.1B current 11 rounds. 35 investors (25 institutional + 10 angel).

Investor Behaviour Forensics

GIC : STRONGESTPOSSIBLEINSTITUTIONALSIGNAL

GIC invested in Series B (2022), participated in Series B-II (2023), and co-led Series C (2026). A Singapore Sovereign Wealth Fund ($700B+ AUM) escalating its commitment across 3 rounds over 4 years, maintaining a board seat throughout, is the highest institutional conviction signal available in Indian private markets. GIC's deeptech team conducts independent rocket engineering diligence, not just financial analysis. Their continuous presence from Rs 165 Cr valuation to Rs 9,200 Cr ($1.1B) is the most significant positive signal in this note.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

TEMASEKNON - FOLLOW- O N , MEDIUMPRIORITYFLAG

Temasek led the Oct 2023 pre-Series C at $519M. Temasek does NOT appear in Series C (May 2026) at $1.1B. Three plausible explanations: (1) GIC and Temasek are both Singapore state capital, coordination may have had GIC take the lead role to avoid Singapore SWF concentration in one Indian company; (2) Temasek fund lifecycle or allocation limits; (3) Negative diligence finding. Given GIC's continued escalating presence, option (3) is unlikely. But must be confirmed directly. This flag is notably lower severity than Steadview's non-follow-on at Ethereal Machines, where no complementary SWF was simultaneously escalating.

RAMSHRIRAM ( SHER PA L O ) BOARDSE AT, USMARKETSIGNAL

Ram Shriram: one of Google's earliest investors, Alphabet board member since 1998. His joining Skyroot's board at Series C is not a financial signal, it is a US commercial market signal. Shriram has relationships with every major US satellite operator, constellation developer, and defense prime. His addition is the clearest signal yet that Skyroot is targeting US revenue, not just Indian government launches. This is the most underappreciated strategic element of the Series C.

4 FINANCIAL FORENSICS

Multi-Year Financial Reconstruction

METRIC

FY2023 (MCA

CONFIRMED)

FY2024 (MCA

CONFIRMED)

FY2025

(PROVISIONAL)

FY2026 (PROVISIONAL,

ENTRACKR)

Operating

Revenue Rs ~40 lakh Rs 0 operating Rs 0 operating Rs 101 Cr Interest / Other Income Rs 14.6 Cr (total) Rs 29.0 Cr (+99.5%) ~Rs 25-35 Cr est. Not separately disclosed Total Expenses Rs 62.8 Cr Rs 84.5 Cr (+34.5%) ~Rs 130-140 Cr est. ~Rs 231 Cr est. (EBITDA + revenue)

Net Loss (PAT) Rs -48.2 Cr Rs -55.3 Cr (+15%) ~Rs -107 Cr ~Rs -130 Cr est. Negative Rs -34.9 Cr (est.) Rs -107.7 Cr (Entrackr) Rs -130.3 Cr (Entrackr provisional) Cash Burn (annual est.)

~$15M ~$35M ~$40-45M ~$50M (Vikram-2 dev begins) Evidence Level HIGH (MCA) HIGH (Inc42 Datalabs MCA) MEDIUM (provisional) MEDIUM (provisional, Entrackr)

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

EBITDADETERIOR AT INGDESPITEREVENUEGROWTH

FY25 EBITDA: Rs -107.7 Cr. FY26 EBITDA: Rs -130.3 Cr. Revenue jumped from Rs 0 to Rs 101 Cr but losses also deepened. FY26 loss-to-revenue ratio: 129% (company spends Rs 2.29 for every Rs 1 it earns). This is NOT unexpected for a pre-commercial-launch rocket company investing heavily in Vikram-2 development and Max-Q facility. But it means the company is NOT capital-efficient yet, and will not be until commercial launch revenue (not components revenue) kicks in at scale.

Capital Efficiency & Runway Analysis

METRIC VALUE RUPEIA ASSESSMENT

Series C proceeds available $60M equity + $10.8M NCD = $70.8M total Gross available before Vikram-2 development allocation Current operating burn (FY26 run rate)

~Rs 230 Cr/year (~$28M/year at current exchange) FY26 EBITDA -Rs 130 Cr + capex est. Rs 100 Cr Vikram-2 development cost (est.)

$50-80M over 2 years = $25- 40M/year additional Series C allocation undisclosed; this is the critical unknown Total burn if Vikram-2 in- flight $53-68M/year Exceeds Series C proceeds in Year 1 Theoretical gross runway $70.8M / $53-68M pa = ~12-16 months Without commercial launch revenue Revenue offset (post-launch, FY27)

$30-80M from 3-5 missions at $4- 6M each If Vikram-1 succeeds and cadence builds Real runway conclusion Series D needed by FY28 regardless Commercial launch revenue buys time but does not eliminate need for Series D Entrackr's internal document review cited a projection of Rs 13,205 Cr revenue by FY32. At FY26's Rs 101 Cr, this implies a 97% CAGR for 6 years, or 130x growth. For reference: Rocket Lab (the best-performing comparable globally) grew revenue from $36M to $436M over 4 years post-operational launch phase, a 12x growth at 86% CAGR. Skyroot's internal projection outpaces even the best global comparable. Rupeia treats this as a management aspiration framed to justify Series C valuation, not a financial forecast. Our own scenario models are on Page 16.

5 PIPELINE-TO-CASH CONVERSION MODEL

RUPEIAPROPRIE TA RYANA LYS I S

Pipeline is not revenue. This section calculates expected cash from Skyroot's stated customer relationships, applying sector-specific conversion rates and collection timelines. This analysis does not appear in any

fund-written note on Skyroot.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

REVENUE

STREAM STATED CLAIM

CONVERSION RATE

(RUPEIA EST.)

EXPECTED

CASH (24

MONTHS) KEY RISK

FY26 Space Systems components Rs 101 Cr (provisional, Entrackr)

85-90% collection (B2B components; 60-90 day terms) Rs 85-90 Cr Customer concentration unknown.

If 2-3 customers = 80% of revenue, loss of one is material. Vikram-1 launch missions (post- confirmation)

Exolaunch SPA + CEO demand statements 40-60% of accessible pipeline signs firm in 12 months post-launch Rs 0-80 Cr (FY27) ENTIRELY CONDITIONAL on successful orbital insertion. Launch failure = Rs 0.

Indian govt satellite pipeline (~100 sats) CEO claim (Via Satellite Mar 2026)

5-15% to signed contract in 24 months (govt procurement: 18-36 month cycles)

Rs 10-40 Cr (FY28) Open competition. ISRO SSLV, AgniKul, international providers all compete.

Exolaunch SPA, international customers Access to 250+ Exolaunch customers 20-30% sign firm bookings in 24 months post-successful launch Rs 30-80 Cr (FY27-28)

Exolaunch relationship is contingent on Skyroot reliability >95% after 3 launches. They serve customers, not Skyroot.

Vikram-2 missions (FY28 onward) 1-ton class at $10- 15M per mission; 4-6 launches FY28-29 60-70% (Vikram-2 success conditional on Vikram-1 success)

Rs 350-550 Cr (FY28-29) Requires $50-80M capex + additional 18-24 months development. Not

funded from Series C alone.

Total expected cash (24 months, conditional on Vikram-1 success): Rs 125-290 Cr. Operating burn over same 24 months: Rs 460 Cr (2 years at Rs 230 Cr/year). Net cash position from operations + pipeline: Rs -170 Cr to Rs -335 Cr. The Rs 587 Cr ($70.8M) Series C proceeds bridge this gap with Rs 252-417 Cr of headroom, sufficient for 13-22 months of additional operating burn if no commercial launch revenue materialises. This is thinner than the headline $1.1B valuation implies. A launch failure and 18-month recovery cycle would require a bridge round or Series D before the window closes.

6 MARKET OPPORTUNITY

SEGMENT SIZE / CAGR SKYROOT ENTRY SOURCE RUPEIA ASSESSMENT

Global Small Sat Dedicated Launch (<500 kg) $3.5B/year by 2030 (SpaceWorks)

Vikram-1 dedicated: 350 kg payload SpaceWorks Commercial 2025 Highest-conviction addressable market.

75%+ of global launches will be small sats by 2030. Dedicated vs. rideshare is different product with premium pricing.

Global Small Sat Rideshare $1.2B/year by 2030 (Euroconsult)

Vikram-1/2 rideshare via Exolaunch SPA (2026-27 planned) Euroconsult 2025 SpaceX Transporter at $6,000/kg is the benchmark. Skyroot must price below $5,000/kg. Exolaunch SPA gives immediate access to 250+ customers.

India Govt / Defence Satellites ~100 small sats, 5-6 year pipeline (CEO claim); India defence budget FY26: Rs 6.22 lakh Cr Vikram-1 best-suited class; IN-SPACe policy redirecting commercial launches to private

sector

IN-SPACe annual report; CEO Via Satellite Mar 2026 High conviction that 100 govt sats NEED launch. Low conviction Skyroot wins all, ISRO SSLV, AgniKul, international providers compete.

Realistic Skyroot share: 20-35%. India Private Space Economy $8.4B current to $44B by 2033 (GoI estimate). 400+ Indian space startups need domestic launch.

Skyroot as domestic launch provider for Indian startup payloads IN-SPACe 2026 policy documents Structural: India manufacturing more satellites, fewer domestic launchers.

Skyroot has structural advantage as first mover.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

SEGMENT SIZE / CAGR SKYROOT ENTRY SOURCE RUPEIA ASSESSMENT

Axiom Station / LEO commercial Global commercial LEO

market; Axiom Station

2028 target Vikram-1/2 for payload delivery under Jun 2025 MoU Axiom Space official PR Very early stage. MoU is non-binding.

Axiom Station under construction. Revenue earliest FY28-30. SOM Reality Check: At 4-8 Vikram-1 launches/year at $4-6M each = $16-48M annual revenue (Rs 130-400 Cr). At 8-12 Vikram-2 launches/year at $10-15M = $80-180M (Rs 670-1,500 Cr). The Rs 13,205 Cr FY32 internal projection requires 150+ launches per year, 3+ rockets launching per week. This implies a manufacturing and launch infrastructure investment not yet funded by the Series C. Rupeia's realistic SOM through FY30: Rs 500-1,500 Cr. Not Rs 13,000 Cr.

7 COMPETITIVE ANALYSIS

7A. Launch Vehicle Competitor Table

COMPETITOR HQ VEHICLE

PAYLOAD

LEO PRICE/LAUNCH

STATUS

(JUN 2026)

SKYROOT

ADVANTAGE

SKYROOT

DISADVANTAGE

Rocket Lab (Electron) USA/NZ Electron (expendable + reusable booster)

300 kg $8.5M 50+ launches; ~14/year in 2024; reusability program active ~40-50% cheaper; comparable payload class; India cost base 50+ launch heritage.

Reusability reducing $/kg. Skyroot has 0 orbital launches. AgniKul Cosmos India Agnibaan (semi- cryogenic)

~100 kg ~$3-4M est. Suborbital only (Agnilet 3D engine success May 2024).

Orbital: 2027 est. Skyroot: orbital- class; 3.5x more payload; 2-3 year lead AgniKul's 3D-printed engine is genuine innovation. Full Agnibaan orbital: 24-36 months away.

SpaceX Transporter USA Falcon 9 rideshare program Variable ~$6,000/kg Weekly rideshare cadence; dominant

market share

Skyroot: dedicated orbit selection; schedule control; faster deployment SpaceX Starship will further reduce rideshare pricing.

Structural existential long-term threat. ISRO SSLV India (Govt)

SSLV (expendable) 500 kg $15-18M est. Operational; government priority queue for commercial Skyroot: commercial SLA; faster booking; no govt queue; 40% cheaper ISRO: trusted government brand; subsidised pricing for Indian customers; preferred vendor status.

Isar Aerospace Germany Spectrum 1,000 kg ~$15M First launch 2024 (partial failure); 2025-26 operational target Skyroot: lower price; operational sooner; India geography (SSPO advantage)

Isar: EU institutional backing; Airbus supply chain. More payload for heavier missions.

Firefly Aerospace USA Alpha 1,000 kg ~$15M Operational 2024; Nasdaq- listed; DoD contracts Skyroot: India cost base; smaller sat focus; dedicated on-demand Firefly: listed company, public financials, DoD heritage, proven 1-ton class.

7B. Capability Matrix, Yes / No / Partial Every cell independently sourced from published datasheets, company websites, Wikipedia mission records, and press releases. No cell is taken from the company's own competitive analysis. "PARTIAL" = exists but

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

with material caveats.

CAPABILITY DIMENSION SKYROOT

ROCKET

LAB AGNIKUL

SPACEX

(RIDESHARE) ISAR

ISRO

SSLV FIREFLY

Orbital launch vehicle at launchpad / operational

PARTIAL YES NO YES PARTIAL YES YES

Successful orbital launch(es) completed

NO YES NO YES PARTIAL YES PARTIAL

India-manufactured rocket YES NO YES NO NO YES NO 3D-printed rocket engines YES YES YES NO YES NO YES Carbon composite structure YES YES YES PARTIAL YES NO PARTIAL All stages qualified first attempt (record)

YES YES NO YES PARTIAL YES NO

Dedicated orbit selection for customer

YES YES NO NO YES PARTIAL YES

Price < $8M per orbital mission YES NO YES NO NO NO NO Rideshare integrator partnership (active)

YES YES NO YES PARTIAL NO PARTIAL

Cryogenic upper stage (operational) NO YES NO YES NO YES NO Reusable first stage booster NO YES NO YES NO NO NO Government customer contracts (signed / executing)

PARTIAL YES NO YES PARTIAL YES PARTIAL

ISRO facility access (shared launch infrastructure)

YES NO NO NO NO YES NO

SWF or institutional investor backing YES PARTIAL PARTIAL YES YES NO NO Key-man insurance / documented succession plan

? YES ? YES YES YES YES

YES (green) = confirmed from independent sources. PARTIAL (amber) = limited or partial capability. NO (red) = not offered or not confirmed. UNKNOWN (grey) = insufficient public data. THE SINGLE MOST IMPORTANT CELL: "Successful orbital launches completed = NO" Every competitor in this table except AgniKul has already done what Skyroot is about to attempt. Investors are paying $1.1B pre-money for the moment that NO becomes YES. When (and if) Vikram-1 successfully inserts payloads into orbit, this entire competitive matrix reframes. Skyroot moves from "promising" to "proven." The valuation question then becomes whether proven is worth more than the $1.1B pre-money already paid, and the answer depends on cadence, not just the first success.

8 MOAT ANALYSIS, HALF-LIFE & EXPIRY MAP

CLAIMED MOAT

INDEPENDENT

EVIDENCE

VERIFICATION

LEVEL

DURABILITY

(YEARS) EXPIRY TRIGGER KEY THREAT

4-6 year technology lead over any new Indian entrant Vikram-S 2022; all stages qualified; Sriharikota active.

AgniKul 2-3 years behind on orbital. VERIFIED (relative to India)

4-6 years from The day AgniKul Cosmos achieves orbital insertion (est.

2027-28) AgniKul Agnilet success (May 2024) proves Indian 3D-printed engine works.

Agnibaan orbital = 24-36 months. Narrowing.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

CLAIMED MOAT

INDEPENDENT

EVIDENCE

VERIFICATION

LEVEL

DURABILITY

(YEARS) EXPIRY TRIGGER KEY THREAT

India cost arbitrage (40-50% below West) CEO + Ram Shriram explicit. India engineering salaries 60-70% below US/EU. Structurally sound.

PROBABLE (no audit) 10+ years structural India salary inflation (10-15% pa) gradually erodes. Not a near- term threat.

Global companies building India manufacturing (Apple, SpaceX exploring India MFG) would close cost gap.

Ex-ISRO founding team (irreplaceable domain knowledge) Chandana (LVM3 satellites)

+ Daka (propulsion). Both 10+ years ISRO experience. Not hireable. VERIFIED Indefinite (while founders remain)

Founder departure or illness Dual key-person risk. No succession plan visible.

Most fragile moat. ISRO infrastructure access (Sriharikota first-mover)

First private company at SDSC. IN-SPACe authorised. VERIFIED 3-4 years (exclusive in practice)

IN-SPACe authorises AgniKul or another private company for same facilities NOT exclusive, IN-SPACe can and will authorise others. Temporal advantage only.

Flight heritage (post first successful orbital launch)

DOES NOT YET EXIST.

Zero orbital launches as of Jun 2026.

NOT YET

ACQUIRED

3-5 years from first success Third competitor achieves 5+ orbital launches and gains preferred supplier status Heritage moat cannot be bought or assumed. Must be earned mission by mission.

Exolaunch partnership, international customer access SPA signed Oct 2025. 250+ customers, 20 countries accessible.

VERIFIED (SPA

document) 3-5 years Exolaunch signs SPA with AgniKul or international competitor offering better economics Exolaunch is commercially agnostic. They will use whoever best serves their customer base.

India government alignment and political recognition PM Modi facility inauguration (Nov 2025). IN- SPACe ecosystem. Bharat Innovates 2026 participation.

VERIFIED 5-7 years (current political cycle) Change in space policy or IN-SPACe mandate revision Bipartisan support for space privatisation in India is currently strong. Not a near-term risk.

THEMO AT T H AT DOESNOTYETEXIST

Flight heritage is the single most valuable moat in commercial launch. Satellite operators will pay a premium to a provider with 5+ successful launches over a cheaper provider with 1 launch. Rocket Lab built its pricing power through heritage, not through cost. Skyroot's 2022 Vikram-S suborbital mission is proof of concept, not orbital heritage. The first Vikram-1 success creates 1 data point. The second creates a trend.

The third creates a moat. Current investors are paying for all three simultaneously.

9 CUSTOMER INTELLIGENCE & BUSINESS TRACTION

Customer Truth Table

CUSTOMER /

PARTNER

CLAIMED

RELATIONSHIP

PUBLIC EVIDENCE

FOUND RELATIONSHIP TYPE PAID? REPEAT? GRADE

Exolaunch GmbH (Germany) Strategic Partner (SPA Oct 2025)

Exolaunch official press release Oct 14, 2025. Both CEOs quoted. Commercial partnership, gives access to 250+ Exolaunch customers Contingent on launch success Structural (SPA framework)

A SpaceKidz India Vikram-S 2022 payload ISRO mission records;

company press; SpaceKidz

confirmed in multiple media Paid payload customer (suborbital only)

YES (suborbital) Unknown, no Vikram-1 booking A

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

CUSTOMER /

PARTNER

CLAIMED

RELATIONSHIP

PUBLIC EVIDENCE

FOUND RELATIONSHIP TYPE PAID? REPEAT? GRADE

BazoomQ Vikram-S 2022 payload Same mission records Paid payload customer (suborbital)

YES (suborbital) Unknown A N-Space Tech Vikram-S 2022 payload Same mission records Paid payload customer (suborbital)

YES (suborbital) Unknown A Axiom Space MoU partner (Jun 2025)

Axiom official PR Jun 25, 2025. Both CEOs signed. Non-binding MoU, future logistics exploration No N/A, pre- commercial B Nibe Space consortium MoU partner (Sep 2024)

Public MoU announcement Non-binding MoU, India first multi-sensor EO constellation No N/A C ~100 Indian govt satellites CEO-stated pipeline IN-SPACe policy documents confirm NEED; no contract list Prospect pipeline, no signed contract No N/A D International operators (via Exolaunch)

Accessible via SPA Exolaunch customer network confirmed (250+ in 20 countries) Accessible prospects, post- launch activation No (post- launch)

N/A B

REORDERINTELLIGENCE : ZEROORBI TA L PAY INGCUSTOMERSYET

Skyroot's only confirmed paying customers are three suborbital payloads from 2022 (Vikram-S). No confirmed paying Vikram-1 customer has been publicly named. The Exolaunch SPA converts to revenue only after a successful orbital launch. All other customer relationships are MoUs, CEO claims, or accessible prospects. This is not unusual for a pre-launch orbital company, but it means the revenue pipeline is entirely pre-commercial. Require a signed customer list (even if anonymised by sector) as a gating condition for investment.

Survive-Success Analysis, Can Skyroot Handle Rapid Demand? If Vikram-1 succeeds and Exolaunch activates 8-10 firm bookings in 2026-27, can Skyroot execute?

OPERATIONAL

REQUIREMENT

CURRENT

CAPACITY GAP TIME TO CLOSE CRITICAL RISK

Rockets for 8-10 missions/year Max-Q rated ~12 rockets/year. 1 Vikram-1 at pad.

Need 7-9 additional rockets in 12 months 3-4 months per rocket manufacturing cycle (composite winding, integration, test). Feasible if no quality holds.

Quality control at scale. First Vikram-1 will reveal any systematic manufacturing issues in the carbon composite process.

Launch pad slots ISRO Sriharikota (2 pads: SLP + FLP). Shared with PSLV, LVM3, Gaganyaan.

Cannot guarantee >2-3 Skyroot launches per year without private pad Telangana private launch facility MoU signed Jan 2025. Construction not started.

This is the binding constraint. Not technology, not money, not rockets. Launch pad access limits Skyroot to 2-3 launches/year until private pad operational (est. 2028-30 at earliest).

Engineering team for parallel builds ~879 employees (Jun 2026)

8-10 parallel builds need ~1,500-2,000 qualified aerospace engineers 12-24 months to recruit and train (aerospace skills are scarce)

India produces <3% of engineers with aerospace manufacturing readiness. Talent is real bottleneck 2.

Working capital for 8-10 missions Materials upfront; customer pays 30-60 days post-delivery 8-10 missions x Rs 35-45 Cr materials cost = Rs 280-450 Cr upfront before collection Credit line or advance payments from customers needed Standard aerospace practice: 30-50% upfront from customers. Must negotiate this into all contracts.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

THESURVIVE - SUCCESSBOTTLENECKTH AT NOONEELSEHASFLAGGED

The constraint on Skyroot scaling to 8+ launches per year is NOT manufacturing capacity (Max-Q can build 12 rockets/year) and NOT engineering talent (solvable in 12-24 months) and NOT working capital (Series C covers it). The binding constraint is LAUNCH PAD ACCESS. Sriharikota has 2 pads owned by ISRO. ISRO’s own manifest (PSLV, LVM3, Gaganyaan, SSO missions) takes priority. Skyroot can realistically access 2-4 Sriharikota slots per year before 2028. At $4-5M per launch x 4 missions = $16-20M annual revenue, far short of what the $1.1B valuation requires. The Telangana private launch facility MoU is the solution, but it is 3-5 years from operational. This gap is the most important constraint in all Skyroot coverage, and it appears in none.

10 RISK ANALYSIS, COMPREHENSIVE

RISK SEVERITY DETAIL & MITIGANT RESIDUAL RISK

LAUNCH

FAILURE

(Binary event) CRITICAL First orbital launch historically fails 30-50% of the time. Even well-prepared rockets fail: SpaceX Falcon 1 (3 failures before success), Rocket Lab Electron (first launch failed), ISRO has 2 recent consecutive mission failures. A Vikram-1 failure resets all forward assumptions by 18-24 months.

Mitigant: 5 stage programs qualified first attempt; Vikram-S heritage; $10.8M NCD provides liquidity buffer; experienced founding team.

CANNOT BE MITIGATED,

accepted as investment risk.

Market-implied probability: 50-

70% success (based on launch insurance pricing of ~3-5% of launch value for first flights). Timeline slippage (historical 24+ months)

HIGH Original target was 2024, then Q1 2026, then June 2026. rocketlaunch.org shows "NET 2026 TBD" as of Jun 25, 2026. Each 6-month delay costs ~$14M in additional burn. Mitigant: rocket physically at Sriharikota, delay now days-to-weeks, not months.

MEDIUM, delay risk is now weather/scheduling, not engineering. Launch pad access constraint (binding post- launch)

HIGH ISRO owns Sriharikota. Private company access is negotiated per mission. At 8+ launches/year, Skyroot exceeds realistic ISRO slot availability without a private pad. Telangana private facility MoU: non- binding, construction not started. Mitigant: IN- SPACe policy supports private pad; Telangana alignment.

HIGH, this is the most underappreciated long-term constraint. Limits revenue to Rs 100-200 Cr until private pad opens (est. 2028-30).

SpaceX Transporter + Starship rideshare HIGH SpaceX Transporter at $6,000/kg weekly cadence.

Starship (when operational) will reduce this to $2,000-4,000/kg. Mitigant: dedicated launches offer orbit selection and schedule control premium. Skyroot targets dedicated, not rideshare.

MEDIUM, dedicated vs. rideshare is a different product. But SpaceX reusability improvements will pressure all launch pricing over 5-10 years.

AgniKul Cosmos catch- up

MEDIUM-

HIGH AgniKul Agnilet 3D-printed engine success (May 2024) is real. Agnibaan orbital attempt est. 2027-28. If AgniKul succeeds before Skyroot on second attempt, "first Indian private orbital launch" narrative shifts. Mitigant: Skyroot launch campaign is active NOW.

MEDIUM, 18-24 month lead still exists. Narrowing. Monitor AgniKul milestones.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

RISK SEVERITY DETAIL & MITIGANT RESIDUAL RISK

ITAR compliance (US customers + components)

MEDIUM-

HIGH MMH/NTO propellants used in Raman engines are ITAR-controlled. Any US-origin guidance components trigger ITAR. US commercial satellite customers require ITAR-free launch provider.

Skyroot's ITAR status is not publicly confirmed. Mitigant: company has taken India-first design approach; no confirmed US-origin critical components in public sources.

MEDIUM, must resolve with US export control attorney before targeting US customers. Ram Shriram board seat suggests this is already being addressed.

Key-person risk (dual founders) MEDIUM Both Chandana and Daka are essential. Loss of either: major setback. No successor named.

Mitigant: GIC/Sherpalo board oversight; company culture of execution; key-person insurance (unverified). MEDIUM, mitigable with term sheet provisions and insurance.

SECTOR-

SPECIFIC:

India spacetech

sector setback

risk

MEDIUM A Skyroot launch failure would be India's first private orbital launch failure, not just a company event. Could trigger IN-SPACe regulatory review, reduce investor appetite for ALL Indian spacetech, and delay sector capitalisation. Mitigant: IN-SPACe and government have structural incentive to support recovery.

MEDIUM, company risk creates

sector externality. GIC and

Temasek have sector-wide exposure and would likely support recovery.

11 TEAM, GOVERNANCE & PEOPLE INTELLIGENCE

Founder Assessment

DIMENSION PAWAN KUMAR CHANDANA (CEO) NAGA BHARATH DAKA (COO)

Education IIT Kanpur (EEE), VERIFIED (LinkedIn, multiple press) NIT Warangal, VERIFIED (LinkedIn, multiple press)

Prior role ISRO satellite systems engineer, LVM3 programme, VERIFIED ISRO launch vehicle propulsion engineer,

VERIFIED

Domain credibility Deepest possible: ISRO is the source of Indian rocketry. His network spans Indian space establishment.

Same, propulsion expertise is the most critical technical function for a launch company. Public statement consistency Consistent narrative across 8 years of interviews (Inc42, Dailyhunt, SATShow, Times of India).

"Uber for satellites" framing consistent. No material contradictions found. Less public-facing. Technical credibility confirmed by Speciale Invest, Pi Ventures (aerospace-expert VCs who did independent technical diligence before Series A).

Key-person risk CRITICAL, only public face; all investor relationships; strategy authority. CRITICAL, design authority for all Vikram vehicles. If Daka left, no named successor has Vikram-1/2 design knowledge.

Succession plan NOT VISIBLE IN PUBLIC SOURCES NOT VISIBLE IN PUBLIC SOURCES

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

Board Composition (Post-Series C)

BOARD MEMBER ROLE STRATEGIC VALUE

Pawan Kumar Chandana Founder-CEO (executive director)

Vision, technology strategy, fundraising Naga Bharath Daka Founder-COO (executive director) Engineering authority, operations Mayank Rawat, GIC Independent director (from Series B, 2022)

Singapore SWF oversight. GIC has deeptech portfolio experience across Asia. 4-year governance continuity. Ram Shriram, Sherpalo Ventures New Series C addition Alphabet board member, Google early investor. US satellite operator + defence prime relationships. Critical for US market entry.

S. Somanath (honorary) Ex-ISRO Chairman, Honorary Chief Technology Advisor Highest possible ISRO alignment signal. His presence means India's space establishment endorses Skyroot, not merely tolerates it.

Culture & Headcount Intelligence

HEADCOUNTCONFLICT

Exolaunch Oct 2025: "over 650". Inc42 Datalabs Jun 2026 (MCA-adjacent): 879. Dailyhunt May 2026: "over 1,000 people." Three different figures in 8 months suggests rapid scaling AND inconsistent counting (employees vs. contractors vs. interns). Primary: 879 (Inc42, MCA-adjacent, most recent statutory-based figure). Verify via EPFO employer portal before investment commitment.

Glassdoor data for Skyroot Aerospace is limited (fewer than 15 reviews as of Jun 2026), sample too small for reliable culture signal. Alternative proxy: the company retained both founders for 8 years through a period that included a Rs 48 Cr loss year (FY23) and a 4-year institutional funding drought (2019-2023). This cultural durability during adversity is a stronger signal than any Glassdoor score. Teams that stay through funding droughts are different from teams hired during funding peaks.

12 VENDOR / PAYMENT STRESS INDEX & LEGAL SURFACE MAP

Vendor / Payment Stress Index

SIGNAL

SOURCE /

METHOD FINDING RISK LEVEL RUPEIA INTERPRETATION

Trade payables trend MCA balance sheet FY24 (Inc42 Datalabs)

Rs 12-15 Cr payables est. (FY24) LOW-MEDIUM Payables modest relative to Rs 84.5 Cr total expenses. Not under vendor stress in FY24.

Operating cash

flow

MCA FY24 /

FY26 provisional FY24: Net loss Rs 55.3 Cr, zero

operating revenue. FY26: Rs 101

Cr revenue vs Rs 230 Cr est. expenses. HIGH (pre- revenue phase expected)

All spending is investment. Not operational waste. Expected for pre- commercial launch company.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

SIGNAL

SOURCE /

METHOD FINDING RISK LEVEL RUPEIA INTERPRETATION

BlackRock NCD (Rs 90 Cr, Mar 2026) MCA charges register / CBInsights Rs 90 Cr NCD registered as charge against assets LOW-MEDIUM Standard working capital instrument.

Not distress. Secured at commercial terms. EPFO compliance EPFO employer portal (MUST

CHECK)

NOT VERIFIED IN THIS

REPORT

UNKNOWN No salary delay allegations in public domain or Glassdoor. But verify before investment. Propellant supply chain

(MMH/NTO,

LOX/LNG)

Company press

+ technical specs MMH/NTO for Raman: internationally sourced, ITAR- controlled. LOX/LNG for Dhawan: ISRO industrial gas suppliers available in India.

MEDIUM Foreign-currency MMH/NTO procurement for each launch adds cost and regulatory complexity. No Indian MMH supplier.

ITAR controlled components

US DDTC;

company

statements Raman engines use MMH/NTO (ITAR schedule I). Any US-origin guidance components = full ITAR applicability.

MEDIUM-HIGH Must conduct ITAR audit before targeting US customers or using US- origin components in Vikram-2. Carbon composite supply chain Industry standard;

company press

3D printing materials + carbon fibre largely India-sourced or import-available. No single-source dependency identified.

LOW Carbon composite is globally available. India domestic supply chain adequate for Vikram-1 volumes.

VENDORSTRESSINDEXOVERALL : LOW- MEDIUM

No active litigation, no salary delay signals, NCD is routine working capital, EPFO unverified but no public flags. The most significant operational risk is ITAR compliance for international customers, addressable with a qualified US export control attorney and appropriate compliance programme. GIC and Sherpalo (with Singapore and US commercial relationships respectively) will likely require this before they activate international customer introductions.

Legal & Compliance Surface Map

AREA CHECK METHOD FINDING RESIDUAL RISK

Litigation (company + founders) eCourts.gov.in, NCLT, Hyderabad District Court No litigation found against Skyroot Aerospace Private Limited or founders as of Jun Hidden international arbitration possible (launch contracts typically include London/Singapore arbitration clauses)

IN-SPACe authorisation IN-SPACe authorised entities list CONFIRMED, Skyroot authorised. First private

company to launch from SDSC.

Policy reversal risk: LOW. Cross- party political consensus supports private space. IP / Patents IPO India (ipindia.gov.in), applicant name search Kalam and Dhawan engine family patent applications exist. Grant status requires direct IPO search.

Competitor copying designs is possible without granted patents. India-only patent = no protection in export markets.

ITAR compliance US DDTC (ddtc.state.gov) NOT VERIFIABLE from public sources Material risk if MMH/NTO classified hardware or US-origin guidance components used in Vikram vehicles.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

AREA CHECK METHOD FINDING RESIDUAL RISK

Launch liability insurance IN-SPACe launch regulations (mandatory for SDSC launches)

MUST HOLD, required by IN- SPACe regulations to access Sriharikota. Amount and provider NOT PUBLICLY

DISCLOSED.

If uninsured and launch causes third-party damage = unlimited liability. Verify insurance documentation.

MCA filing compliance MCA portal (company CIN

U74999TG2018PTC126727)

Active. Filings current. No strike-off notices. Minor late filing risk during high- activity periods (fundraising + launch campaign simultaneously).

Telangana private facility MoU Karnataka / Telangana Industries Dept; KSIIDC MoU signed Jan 2025 at WEF.

Rs 500 Cr investment stated. Land acquisition status: NOT

CONFIRMED.

MoU is non-binding. Actual facility requires land, environmental clearance, ISRO/IN- SPACe approvals = 3-5 year timeline minimum.

13 VALUATION UNDERWRITING, WHAT WOULD NEED TO BE

TRUE Skyroot's Series C pre-money is $1.1B (Rs 9,200 Cr at Rs 83.5/$1). Post-money: ~$1.16B. For current investors to achieve institutional-grade returns (3-5x), exit valuation must reach $3.3-5.5B. What has to be true for each scenario:

SCENARIO KEY ASSUMPTION

FY31E

REVENUE EXIT MULTIPLE

EXIT EV

RETURN ON $1.1B PRE-

MONEY ENTRY

BEAR Vikram-1 fails or delays 12-18 months; 2-3 launches/year by FY31; no Vikram-2 $35-55M (Rs 290-460 Cr)

5-6x EV/Rev (distressed launch co.) $175- 330M ~80-85% capital loss. Bears who bought at $1.1B entry get Rs 1,450-2,750 Cr on Rs 9,200 Cr.

BASE Vikram-1 succeeds; 6-8 launches/year by FY29; Vikram-2 debut FY28; Exolaunch activates international pipeline $120-180M (Rs 1,000-1,500 Cr)

8-10x EV/Rev (Rocket Lab comp) $960M- 1.8B 0.9-1.6x. Near-flat to modest

return. The base case for Skyroot

is capital preservation at Series C entry. BULL 8-10 launches/year Vikram-1; Vikram-2 operational FY27; US customers via Ram Shriram; India govt 30+ sats; IPO at India- US premium $250-400M (Rs 2,100-3,350 Cr)

12-15x EV/Rev (BSE/Nasdaq spacetech premium) $3.0- 6.0B 2.7-5.5x return. 20-35% IRR over 5-6 years. This is the case being priced by the market.

HONEST VA L U AT IONASSESSMENT

At $1.1B pre-money on Rs 101 Cr FY26 Space Systems revenue (no commercial launches), the EV/Revenue multiple is approximately 90x. This is a venture-stage software multiple applied to a capital-intensive orbital launch hardware company. The only comparables are Isar Aerospace (similar pre-commercial stage, similar valuation range) and Relativity Space (pre-commercial, $4.2B valuation before revenue). Institutional investors accepting 90x revenue multiples for launch companies are betting on first-flight binary outcomes, not on current fundamentals. At Rocket Lab's current 7x multiple, Skyroot's Rs 101 Cr FY26 revenue would justify a Rs 700 Cr valuation, not Rs 9,200 Cr. The Rs 8,500 Cr premium above fundamental value is entirely "optionality premium" on the first successful orbital launch.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

Comparable Transaction Analysis

COMPANY /

TRANSACTION STAGE

REVENUE AT

VALUATION EVENT EV MULTIPLE YEAR

Skyroot (Series C) Pre-commercial orbital Rs 101 Cr (Space Systems; no launches) $1.1B ($9,200 Cr)

90x EV/Rev 2026 Rocket Lab (SPAC IPO) 5+ operational launches $35M (FY21) ~$4.2B ~120x EV/Rev 2021 Rocket Lab (current market cap, Jun 2026)

50+ launches, operational $436M (FY25 LTM) ~$3B ~6.9x EV/Rev 2026 Isar Aerospace (pre-IPO, est.) Pre-commercial; first launch 2024 (partial) Not disclosed ~$1B+ Pre-revenue premium Relativity Space (Series E) Pre-commercial; 3D- printed rockets Pre-revenue $4.2B Pre-revenue premium 2022 (before Terran 1 failure)

Relativity Space (post-Terran 1 failure) Post-failure; pivot to Terran R Pivot stage Significantly down N/A 2023 The Relativity Space comparison is the most instructive. Relativity raised at $4.2B pre-launch, Terran 1 failed to reach orbit on its first attempt (March 2023), and the company pivoted entirely to a new rocket (Terran R). Post-failure valuation: materially lower, undisclosed. This is the bear case scenario Skyroot investors must price: not just launch delay, but potential pivoting of the entire program if Vikram-1 has a systematic design failure.

14 EXIT ANALYSIS

EXIT ROUTE TIMELINE VALUATION BASIS

NAMED CANDIDATES /

ROUTES PROBABILITY KEY CONDITION

India BSE/NSE IPO FY29-31 8-12x forward revenue. No listed Indian launch

company exists yet, first-

mover IPO premium possible. Rocket Lab at 7-8x used as anchor. BSE/NSE. NITI Aayog has discussed space sector IPO incentives. GIC (Mayank Rawat board) has experience facilitating Indian listings of Asian portfolio companies.

MEDIUM-HIGH Minimum: 5-8 launches/year reliability + Rs 500 Cr+ annual revenue run-rate. 18+ month profitability-toward track record before listing.

US Nasdaq listing (SPAC or direct) FY30-32 12-15x forward revenue (US SpaceTech premium). Rocket Lab is the Nasdaq comp.

Ram Shriram (Sherpalo, Alphabet board) joining the board is an explicit US listing signal. He has the Silicon Valley relationships to facilitate a SPAC or direct listing.

MEDIUM US revenue traction (currently zero). US/EU AIT facility (announced) is prerequisite. ITAR resolution required.

Strategic acquisition, US defence/aerospace primes FY28-32 10-15x revenue (negotiated premium).

Comparable: Rocket Lab acquired several space tech companies at 8-12x revenue.

Northrop Grumman, Lockheed Martin, Boeing (strategic India launch capacity). L3Harris (small satellite integration). Maxar (satellite customers need launch partners).

LOW-MEDIUM ITAR issues complicate US acquisition of Indian launch

company. Indian government

approval required, rockets are strategic national infrastructure. Expect 24-36 month regulatory review.

Strategic acquisition, Singapore / Asian buyers FY27-30 8-12x revenue. Less ITAR complexity.

ST Engineering Singapore (defence + space). Keppel Group. GIC / Temasek

portfolio companies seeking

India launch exposure. MEDIUM (post- Vikram-1) GIC continuous presence facilitates Singapore buyer introductions. Ram Shriram provides balance with US options.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

EXIT ROUTE TIMELINE VALUATION BASIS

NAMED CANDIDATES /

ROUTES PROBABILITY KEY CONDITION

PE secondary buyout FY27-29 2.5-3.5x invested capital for early investors. Requires Rs 200 Cr+ revenue run-rate.

KKR India, Carlyle, Blackstone, all have Indian deeptech infrastructure exposure.

MEDIUM (if IPO delayed) Cashflow-visible launch revenue. 3+ successful missions. ITAR clean bill of health.

BEARCASEEXIT : $ 2 0 0 - 3 5 0 MON $ 1 . 1 6 BPOST - MONEYENTRY = 8 0 - 8 3 % CAPI TA LLOSS

If Vikram-1 fails and AgniKul subsequently achieves Indian first private orbital, Skyroot loses its primary narrative. A distress acquisition or secondary sale at 5-6x FY26 Space Systems revenue (Rs 101 Cr) = Rs 500- 606 Cr ($60-73M). Against a $1.16B post-money entry, Series C investors lose 83-95% of capital in this scenario. This is not a tail risk, maiden orbital launches have historically failed at 30-50% probability. Price the position accordingly.

15 DEAL TERMS & FOUR GATING QUESTIONS

ROUND Series C, $60M equity + $10.8M BlackRock NCDs (non-dilutive working capital) | Total: $70.8M VA LUAT ION $1.1B pre-money (Business Standard, TechCrunch, SpaceNews May 7, 2026). Post- money ~$1.16B. QUALIFIER: pre-money figure only; presented consistently across all tier-1 coverage.

LEADS GIC (Singapore SWF, co-lead, existing board seat from Series B) | Sherpalo Ventures / Ram Shriram (new, joins board) C O - INVES TO R S BlackRock funds (equity tranche) | Greenko Group founders | Shanghvi Family Office | Arkam Ventures | Playbook Partners CAP TA BLE ( ESTIM AT E D ) Founders: 24.83% (Tracxn, post-Series C)Funds (all institutional): 43.19% | GIC: largest single institutional holder (multi-round)Enterprises: 22.00% (includes Novellus-equivalent strategic investors from earlier rounds)Angels: 6.31%NOTE: Tracxn cap table estimates from RoC allotment analysis. Full cap table not public.

KEYTERMS ( ESTIM AT E D ) CCPS structure (standard for Indian VC-backed rounds at this stage)1x non- participating liquidation preference (standard; verify)Broad-based weighted average anti-dilution (standard for this investor quality)GIC: existing board seat. Sherpalo / Ram Shriram: new board seat.MUST VERIFY: Key-person clause (critical for dual-founder rocket company) | BlackRock NCD covenants and conditions | Milestone triggers (if any) for tranche release

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

RU N WAY C A LC U L AT ION Gross proceeds: $70.8M (Series C equity + NCD)FY26 EBITDA burn: Rs 130.3 Cr/year (~$15.6M/year operating losses)Capex + Vikram-2 development: est. $25- 40M/year additionalTotal real burn: $41-56M/yearReal runway: $70.8M / $41-56M pa = 15-21 months (to Sep 2027, Apr 2028)Revenue offset (FY27, post-Vikram-1 success): $30-80M reduces burn. Series D still required by FY28.

Four Gating Questions, Minimum Verification Before Investment

# QUESTION EXACT VERIFICATION METHOD KILL CONDITION RESOLUTION PATH

1 Vikram-1 orbital insertion confirmation Monitor skyroot.in official channels + ISRO Sriharikota press briefing + SpaceNews. Do NOT invest based on "launch attempt", require confirmed orbital insertion AND payload deployment.

Launch fails or does not achieve orbital velocity = 18-24 month recovery period. Investment pause. Confirmed orbital insertion + payload deployment confirmation from ISRO and independent tracking agencies (18SPCS, ESA space debris network).

2 Temasek non- follow-on explanation Ask Chandana directly: "Temasek led Oct 2023 round. They are not in Series C. What happened?" Then contact Temasek IR separately. Compare answers.

If explanation is a negative

diligence finding on technology or

team = hard stop.

Fund lifecycle constraint

(verifiable from Temasek fund vintage). Concentration limit (verifiable from portfolio

disclosure). Either is acceptable.

3 ITAR compliance status Ask company: "Does any component of Vikram-1 or Vikram-2 use US- origin ITAR-controlled technology?

Do you hold DDTC registration? Provide legal opinion from a US export control attorney." If material ITAR compliance gaps exist without a programme = limits US customer eligibility and strategic acquisition options by US primes.

ITAR legal opinion from Squire Patton Boggs / Covington (leading US export control firms). DDTC registration confirmation.

4 Launch pad access beyond Vikram-1 Request: (1) Letter from IN-SPACe confirming committed launch slots for 2026 and 2027 calendar years. (2)

Telangana private facility MoU specifics: land acquisition status, construction timeline, IN- SPACe/ISRO endorsement.

If no committed pad access beyond 1-2 missions per year = revenue scaling is impossible regardless of rocket manufacturing capacity. Do not invest at $1.1B valuation if revenue is capped at Rs 100-200 Cr by pad access.

Multi-year launch slot agreement from ISRO/IN-SPACe (even 3-4 slots/year is acceptable if trend is upward), OR confirmed Telangana private pad with groundbreaking date and environmental clearance.

16 INVESTOR CLASS ANALYSIS, RISKS & REWARDS BY

INVESTOR TYPE

RUPEIASECTION , UNIQUETOTHISREPORT

This section does not appear in any fund-written note on Skyroot. Each investor class has a fundamentally different risk exposure, return expectation, and failure scenario from the same investment. Read the section relevant to your class carefully before evaluating the sections relevant to other classes. This section is not a personal recommendation; it is a framework for evaluating the investment by investor class, not advice to invest.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

For Individual Investors (HNIs / Angel / UHNI via AIF or co-invest) The individual investor considering Skyroot at Series C pricing ($1.1B pre-money, minimum Rs 1 Cr ticket via Category I AIF) must understand one fact above all others: this is not a diversified portfolio position. It is a binary ticket. If Vikram-1 achieves orbital insertion, the company moves from pre-commercial to commercial status overnight, Exolaunch's 250+ customers become addressable, and the narrative shifts from "India's promising rocket company" to "India's only proven private orbital launch provider." The FY27 revenue trajectory, if even 5-6 launches are successfully executed, could reach Rs 200-300 Cr, compressing the 90x multiple to 30-40x and making a FY29-30 IPO trajectory credible. At 12x FY29E revenue of Rs 600 Cr, exit = Rs 7,200 Cr on Rs 9,200 Cr post-money entry = 0.8x. Still barely above par for the base case.

The rewards exist only in the bull case: 20+ launches/year, Vikram-2 operational, US customers via Ram Shriram, government pipeline converting. That produces Rs 2,500-4,000 Cr FY31 revenue, 12-15x multiple, Rs 30,000-60,000 Cr market cap, and a 3-6x return on current entry price. For an HNI with Rs 5-10 Cr in a Category I AIF, a 4x outcome on Rs 3-5 Cr allocated = Rs 12-20 Cr. Meaningful but not life-changing. For this class: maximum 2-3% of investable assets, only via an AIF where a professional manages the governance, and only if you have a personal framework for how you will react to a launch failure without panic-selling secondary market positions at distressed prices.

For Family Offices (Indian, NRI, Manufacturing / Industrialist Background Preferred) Family offices are the structurally best-positioned capital class for Skyroot, better than VCs (who have fund lifecycle pressure), better than institutional LPs (who have mark-to-market obligations), and better than individuals (who have no governance rights). The patient capital advantage is real: if Vikram-1 fails and a 24- month recovery period follows, a family office with no LP pressure can hold through the distress and participate in the recovery at Skyroot's likely lower Series D valuation. This patience converts a paper loss into a recovery position rather than a permanent capital loss. The strategic value addition is also genuine: an industrialist family office from aerospace, defence, or precision manufacturing can provide Skyroot with supply chain relationships, government procurement contacts, and customer introductions that no pure-

financial investor can. Chandana has explicitly sought "smart money" in multiple interviews, this describes

family offices with sector expertise, not passive capital. The exit optionality is also wider: a 2x return via PE secondary in FY28 is satisfactory for a 7+ year holding period without carry obligations; it would be a fund- destroying outcome for a VC. The risks family offices must specifically consider: first, the succession risk layered on top of company risk.

A family office committing Rs 10-25 Cr to Skyroot in 2026 is making a bet that both the company and the family investment governance survive to 2031-33. Intergenerational wealth transfer (India's UHNI base is mid-transition) creates governance discontinuities precisely during 5-7 year holding periods. Second, the domain expertise requirement. A manufacturing-sector family office understands ISRO propulsion systems, aerospace qualification cycles, and government procurement timelines, and can evaluate Skyroot's competitive position with real insight. A real estate or financial services family office buying on "India space story" without that domain knowledge is taking risk they cannot properly size. Third, for UAE/Singapore- domiciled Indian family offices: currency risk. A 15% rupee depreciation over 5 years compresses dollar

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

return on a BSE IPO exit by the same 15%. Rupeia recommendation: 3-7% of alternatives book for

manufacturing/aerospace family offices with Rs 100+ Cr in investable assets and 7+ year horizon. Do not lead the round without independent technical diligence. Co-invest alongside GIC or Sherpalo to benefit from their governance rights. For Institutions (VC, PE, SWF, Corporates, DFIs, Insurance/Pension)

Institutional capital in Skyroot is not monolithic. Six distinct institutional types with six distinct investment rationales. VC funds (like Series A investors Speciale Invest, Pi Ventures): the 3-5x return requirement means exit at $3.3-5.5B. Achievable in bull case only. VC funds entering at Series A (~Rs 165 Cr valuation) already have 5-6x gain on paper at $1.1B, their returns are made regardless of what happens to Series C investors.

Series C VC investors (equivalent institutions) need the bull case to generate acceptable returns; the base case is near-flat. For Sovereign Wealth Funds (GIC, Temasek): the investment rationale is strategic, not purely financial. GIC manages $700B+ and holds a 4+ year board position in Skyroot, this is India strategic infrastructure positioning, not a venture return play. A 15-20% IRR over 10 years on a $100M+ position justifies GIC's involvement even at "only" 2x absolute return. Singapore's geopolitical positioning as Asia's space commerce hub (through SWF infrastructure investments in Indian launch companies) has strategic value beyond financial return. For Corporate Strategics: the most interesting underappreciated participant is a US defence/commercial prime taking a minority stake at Series D (post-Vikram-1 success). At $2-3B post- Series D valuation, a $50-100M investment buys: (1) preferred launch access for US constellation customers using Skyroot; (2) a window into Indian government defence launch programs; (3) optionality on acquisition before a BSE/Nasdaq IPO locks in a higher price. L3Harris or Northrop's commercial space divisions are the most natural candidates. ITAR complexity is the barrier, not the investment rationale. For DFIs (NIIF, NaBFID, US-EXIM): construction debt for the Telangana private launch facility is the natural DFI instrument, Rs 500-800 Cr at 8-10% against facility assets, not equity at a 90x revenue multiple. At Rs 9,200 Cr equity valuation, DFI equity is extraordinarily expensive; DFI debt is the right structural fit. For Insurance/Pension funds: not investable pre-IPO. Zero commercial launches, no credit rating, binary- outcome profile. Evaluate post-BSE/NSE listing. The insurance market participates differently, Lloyd's of London and other launch insurers who price Vikram-1 coverage at 3-5% of launch value are implicitly providing the market's probability assessment of launch success. That insurance premium is the cleanest independent signal available for how the market prices Vikram-1 success probability.

17 RED FLAG LEDGER WITH KILL CONDITIONS

RED FLAG EVIDENCE SEVERITY KILL CONDITION WHAT RESOLVES IT

Vikram-1 orbital insertion unconfirmed (as of Jun 25, 2026)

rocketlaunch.org: "NET 2026 TBD"; Wikipedia: "planning first launch by 2026" (present tense) CRITICAL Launch failure (no orbital insertion on maiden flight)

Confirmed orbital insertion announcement + payload deployment at target orbit. Third-party tracking confirmation.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

RED FLAG EVIDENCE SEVERITY KILL CONDITION WHAT RESOLVES IT

Rs 13,205 Cr FY32 revenue projection = 130x growth in 6 years Entrackr review of internal documents (Jun 2026)

HIGH Investors using this as base case for return modelling Rupeia base case: Rs 1,000- 1,500 Cr FY31. Use independently modelled scenarios. Not management projections.

Launch pad access constraint (ISRO owns pads; private facility is MoU only)

ISRO launch schedule; Telangana MoU Jan 2025 WEF HIGH If IN-SPACe cannot confirm 4+ launch slots per year by FY28 Multi-year slot agreement from IN-SPACe/ISRO OR confirmed Telangana private pad with groundbreaking date.

Temasek non- follow-on (pre- Series C lead absent from Series C)

Series C investor list (TechCrunch/StartupTalky) MEDIUM If explanation is a negative diligence finding Direct conversations with Chandana + Temasek IR.

Fund lifecycle explanation is

acceptable. ITAR compliance unverified No DDTC registration or legal opinion in public sources HIGH (for US customers)

If ITAR compliance issues exist without a programme, limits US

market

ITAR opinion from qualified US export control attorney. DDTC registration status. Zero orbital launches completed (as of Jun 25, 2026)

rocketlaunch.org; Wikipedia;

company press

CRITICAL

context Not a kill condition itself, but it means EVERY forward assumption has zero empirical validation at orbital class First successful Vikram-1 orbital insertion converts this flag. Until then: all forward numbers are projections, not evidence.

Vikram-2 full capex unconfirmed ($50- 80M required) Series C use-of-proceeds undisclosed; industry comp MEDIUM If Series D required at distress valuation because Vikram-2 underfunded in Series C Explicit Vikram-2 budget allocation in Series C use-of- proceeds disclosure OR confirmed additional

funding committed.

18 RUPEIA FINAL INDEPENDENT VIEW

Skyroot Aerospace is the highest-quality spacetech investment available in Indian private markets. The technology is real. The founding team is exceptional, two ex-ISRO engineers who have built what critics said Indians could not build. The investor base is the most credible in Indian spacetech history. GIC has been there for four years. Ram Shriram is now on the board. The structural market opportunity is real and growing. The Chinese+1 supply chain shift, the India space economy projected to 5x by 2033, and IN-SPACe policy all create durable tailwinds.

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

RUPEIAVERDICT

The investment is not wrong. The price is aggressive. $1.1B pre-money on zero orbital launch heritage and Rs 101 Cr of Space Systems components revenue is a 90x multiple that requires the bull case to justify. At the base case, successful Vikram-1, 6-8 launches/year by FY29, Vikram-2 FY28, the return for Series C investors is near-flat or modestly positive over 6-7 years. At the bull case, 20+ launches, US

market, Vikram-2 operational, India government pipeline converting, the return is 3-6x and this

investment will be cited as India's defining deeptech bet of the decade. The four gating questions in

Section 15 are binary: resolve them before commitment. If Vikram-1 succeeds (the answer to gating question 1) before you commit capital, the investment becomes measurably stronger.

19 SOURCE LOG, EVIDENCE & CONFIDENCE LEVELS

REF SOURCE DATE KEY DATA CONFIDENCE

[1] TechCrunch (Jeff Foust) May 7, 2026 $60M Series C; $1.1B pre-money; GIC + Sherpalo co-leads; BlackRock equity + debt; June launch target; Vikram-2 HIGH [2] SpaceNews May 7, 2026 Series C details; Ram Shriram board; Vikram-2 900 kg LEO; "best cost-to-performance" CEO quote HIGH [3] Business Standard Apr 25 + May 7, 2026 Vikram-1 flagged off; Max-Q campus; full investor list; Greenko founders; Shanghvi FO HIGH [4] Entrackr (Kunal Manchanda)

Jun 2, 2026 FY26 PROVISIONAL: Rs 101 Cr operating revenue; EBITDA Rs -130.3 Cr (FY26) / Rs -107.7 Cr (FY25); Rs 13,205 Cr FY32 projection

MEDIUM,

PROVISIONAL

[5] YourStory (Aman Rawat) Oct 2024 FY24: Rs 29 Cr interest income; Rs 55.3 Cr loss; FY23: Rs 14.6 Cr; Rs 48.2 Cr loss; Rs 84.5 Cr FY24 expenses HIGH, MCA confirmed [6] Wikipedia (Skyroot + Vikram family)

Accessed Jun 25, 2026 Stage specs; mission history; all static fire dates; Kalam series; Dhawan series; Vikram-S mission records MEDIUM, technical verify with company [7] Exolaunch Official Press Oct 14, 2025 SPA confirmed; EXOtube rideshare integration; "over 650" Skyroot headcount (Oct 2025)

HIGH, primary source [8] Axiom Space Official PR Jun 25, 2025 MoU signed; LEO logistics; Axiom Station payloads; both CEOs signed HIGH, primary source [9] Inc42 Datalabs (MCA- adjacent)

Jun 2026 879 employees; FY24 financials; Vikram-1 product details HIGH, MCA-adjacent [10] CBInsights Apr 8, 2026 Fairing sep test confirmed; NCD Mar 25, 2026 confirmed ($10.75M) HIGH, contemporaneous [11] StartupTalky May 7, 2026 Series C total $160M; 35 investors; cap table: Founders 24.83%, Funds 43.19%, Enterprises 22%, Angels 6.31% MEDIUM, Tracxn-

sourced cap table

[12] Via Satellite / SATShow Mar 2026 CEO: ~100 govt sats pipeline; cost positioning; Vikram-1 dedicated market MEDIUM, CEO stated, unverified pipeline [13] rocketlaunch.org Accessed Jun 25, 2026 Vikram-1: "NET 2026 TBD", launch not yet confirmed MEDIUM, third-party tracker [14] Tracxn (legal entity) Jun 2026 CIN U74999TG2018PTC126727; 879 employees; cap table estimates

MEDIUM, MCA-

adjacent estimates

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT

REF SOURCE DATE KEY DATA CONFIDENCE

[15] Dailyhunt / Inc42 (CEO interview) May 2026 "1,000+ people"; Vikram-S 80% tech reuse; "Uber for satellites"

LOW-MEDIUM, CEO

stated; headcount conflict

[16] NOT ACCESSED

(required for

investment)

MCA direct P&L (Tofler). ITAR DDTC status. EPFO employer data. IN-SPACe launch slot letters. Launch liability insurance. Signed customer contracts.

NOT ACCESSED,

mandatory before

investment

The Standard This report was written without access to the company data room. Every figure is independently

sourced. Where evidence was insufficient, this report says so. Where claims conflict, both are reported.

The four gating questions in Section 15 are the minimum verification required before any capital commitment. Skyroot Aerospace is building something genuinely difficult and genuinely important. The technology is real. The team is exceptional. The price is aggressive. Confirm the launch. Then decide.

DISCLAIMER

This document is published strictly for informational, educational, and academic record-keeping purposes only. The publisher of this document is not a SEBI Registered Investment Adviser (RIA), nor a SEBI Registered Research Analyst (RA). This report does not constitute personal investment advice, an independent research report, a financial recommendation, or an offer or solicitation to buy, sell, or subscribe to any securities. Investments in the securities market are subject to market risks. Read all the related documents carefully before investing.

RUPEIA | INDEPENDENTREPORT | S KY ROOTAEROS PA CESERIESC | JUNE 2 5 , 2 0 2 6

RUPEIA SKYROOT AEROSPACE, SERIES C INDEPENDENT REPORT